s

Thursday, October 29, 2009

Coordination

The drawings show in a diagrammatic form the arrangements desired for the principal apparatus, piping, and similar appurtenances, and shall be followed as closely as possible. Proper judgement shall be exercised in carrying out the work to secure the best possible headroom and space conditions throughout, to secure neat arrangement of piping, valves, fixtures, hangers, and similar appurtenances, and to overcome local difficulties and interference of structural conditions wherever encountered.

The Contractor shall take all measurements for his work at the installation sites, verify all dimensions and conditions at the place of installation, verify subcontractor drawings and be responsible for the proper installation, within the available space of the apparatus specified and shown on the drawings and submit written details and reasons for proposed deviations from drawing and Specifications and shall secure the approval of the Engineer for any variations before making any changes.

No comments:

Post a Comment