Technical Data

The Contractor shall submit the following documents for all equipment in accordance with a time schedule commensurate with the construction programme. The Contractor shall note that this time schedule should be submitted to the Engineer within seven (7) days from the commencement of the Contract, and obtain prior approval.

Submittal 1

Detailed schedule of submittals.

Drawing list and schedule for submittal.

Submittal 2

Shipment schedule

Descriptive catalogues and manuals certified by the manufacturers.

List of materials of construction of equipment.

For each motor: Motor data, including the manufacturer; the minimum guaranteed efficiency and power factor at full load, 3/4 load, and 1/2 load; locked motor current in amps; full load current in amps; the motor speed in rpm; mounting details: motor housing materials; winding material; NEMA Design Letter; NEMA Code Letter; ambient temperatures including de-rating factors and maximum elevations in which motor is designated to operate continuously; service factor; NEMA insulation class; temperature rise; type of enclosure; voltage; bearing life dynamic balance. Field recorded current data shall indicate the full load current for each motor and current rating for the overload relay, each motor starter and control.

Submittal 3

Dimensioned general layout drawings of all equipment

Control panel layouts

Single line diagrams showing final loads and cable sizes

Submittal 4

All remaining Shop/ Construction Drawings

Submittal 5

Draft instruction manuals (in English)