1.4 Water Treatment Plant Capacity

The total treated water requirement of 18 mgd is to be met in three phases each of 6 mgd capacity. Phase I and Ph II shall be completed under the ongoing project where as Ph III will be constructed in future when the need arises. Therefore, two symmetric modules each having capacity to treat 6 mgd of water has been designed and location of third module to be constructed in Ph III has been shown on the layout plan. The plant has been designed on the basis of the maximum day demand.