The Contractor shall execute the Works in such a manner as to avoid interruption and interference with the operation of the existing construction activities, to minimize disturbance to those living or occupying properties near the Work and to all existing services within and adjacent to existing facilities. Access to the existing facilities shall be maintained, to the satisfaction of the Engineer at all times.

The Contractor shall apply to the Engineer in writing at least 28 days before starting any Work which involves interference with the existing structures, equipment, etc or otherwise interfere with or interrupt the Employer’s normal construction activities. The Contractor shall not execute such Work until he has received permission to proceed in writing from the Engineer.

The Contractor shall ensure that no earth, debris or rock is deposited on public or private roads or rights of way as a result of the Works and all vehicles leaving the Site shall be cleaned accordingly.

No comments:

Post a Comment