skip to main
|
skip to sidebar
CONTRACT RULES
s
Tuesday, June 30, 2009
Units of Measurement
All designs, drawings, specifications and manuals shall use FPS units and all measurements dimensions and performance data shall be quoted in those units.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Your Ad Here
About Me
CONTRACT RULES
View my complete profile
200
contract95
contract95
Blog Archive
▼
2009
(235)
►
November
(35)
►
October
(94)
►
September
(13)
►
July
(8)
▼
June
(85)
Purpose and Location of the Works
Description of the Works
Mobilization for Construction
Duty of Employer
Standards and Codes
Drawings
Record Drawings
Site Working Hours
Programme
Meetings and Reports
Temporary Works
Water and Electricity Supply
Toilets
Camps and Accommodation
Photographs
Contamination of Water Supplies
Climatic Data
Level
Units of Measurement
Languages
Contract Signboard
Advertising
Safety Regulations on Site
Protection of Existing Installation
Protection of Existing Public and Private Services
Permits
Location of the Treatment Units
Notice of Operations
Sampling
Responsibility for Sampling and Testing
Agar Nullah, which flows closely on southern side ...
WATER FROM NATURAL SPRINGS
7.3.2.1 NATURAL bank of Agar Nullah at about 800 f...
NATURAL SPRING-2 NEAR UNDER CONSTRUCTION CABLE TUNNEL
NATURAL SPRING “CHASHMA NOON BAGLA” ON HIGH HILLS ...
NATURAL SPRING “CHASHMA NOON BAGLA” ON HIGH HILLS ...
WATER QUALITY AND TREATMENT NEEDED
WATER STORAGE AND DISTRIBUTION SYSTEM FOR C3 COLONY
PROPOSED SEWERAGE SYSTEM, SEWAGE TREATMENT AND ULT...
PROPOSED SURFACE AND HILL WASH STORM DRAINAGE SYST...
EXTERNAL ELECTRIFICATION OF C1 AND C3 COLONIES
CONCLUSIONS AND FURTHER RECOMMENDED ACTIONS BY THE...
GENERAL INTRODUCTION
2.11 Filter Inlet / Backwashing & Drainage Arrange...
2.10.5 Design of Air Scour Pumps & Pipes
2.10.4 Capacity of Backwash & Service Water Sump
Head Loss In Backwashing
Design of Backwash Water Pipes
ign of Filtered Water Channels
2.9.3 Design of Filter Nozzles
2.9.2 Design of Filtered Water Outlet Pipe
2.9.1 Composition of Filter Bed
2.9 Design of Rapid Sand Gravity Filters
2.8 Design of Filter Feeding & Filter Distribution...
2.7.3 Design of Clarifier Effluent Launder
2.7.2 Design of V - Notch (To be installed on the ...
2.7.1 Design of Sludge Pit
2.7 Design of Clarifier with Concentric Flocculati...
2.6 Design of Diffuser Wall
2.5.5 Sizing of Paddle Flocculator
2.5.4 Diameter of the Flocculation Tank
2.5.3 Sizing of Outlet Openings
2.5 Design of Flocculation Tank
2.4 Design of Clarifier cum Flocculator Feeding Ch...
2.3.3 Design of Channel / Launder around Flash Mixer
2.3.1 Sizing of Flash Mixer
2.2 Design of Rising Mian
2.1 Design of Pumping Machinery at Intake Structure
1.6.11 Water Testing Laboratory
1.6.10 Site Workshop
1.6.9 Clear Water Tank & Pumping House
1.6.8 Chlorination Building
1.6.7 Chemical House
1.6.6 Rapid Sand Gravity Filters Beds
1.6.5 Filters Feeding Channel
1.6.4 Clarifiers
1.6.3 Flocculation Tanks
1.6.2 Clarifiers Feed Channel
1.6.1 Flash Mixer and Mixing Chamber
1.6 Components of Treatment Plant
1.5 Water Treatment Processes
1.4 Water Treatment Plant Capacity
1.3 Water Treatment
1.2 Intake Arrangement
Chapter 1 - Intake & Water Treatment Plant
Ads code
Feedjit Live Blog Stats
No comments:
Post a Comment