s

Tuesday, June 30, 2009

Record Drawings

Within 28 days of the issue of a Certificate of Completion, the Contractor shall provide Record Drawings in black line on transparent film and in AutoCAD format in CD. These Drawings shall include:

(a) General arrangement drawings of the Permanent Works.
(b) Project Components drawings showing equipment installation, piping and pumping machinery shall be drawn to a horizontal scale of 1:1250 or 1:500 and vertical 1:200 or 1:100.

The Title Block shall be that of the Engineer responsible for the supervision.

The Employer will supply one velograph copy of the issued drawings, which the Contractor may use to prepare the Records Drawings.

No comments:

Post a Comment